PROJECTS PORTFOLIO

 

Year: 2020 - 2021

Project:

Client:

Renesans Heavy Industries Turkmenistan

IDesign, Procurement, Construction and Commissioning of PE/PP pipeline extrusion facility in Turkmenabat.

 

Key facts:

  • Range of produced diameters 20-630mm

  • Total covered Area 3360m2

  • Capacity of production 1200kg/hour

Client: Water management entity Ashgabatagyzsuw 

 

Year: 2016 - 2017

Project:

Construction of engineering networks of 10 Yyl Abadanchylyk Street from Ankara Street to B.Annanova Street.

Key facts:

Client: Polimeks Insat Turkmenistan 

 

Year: 2016 - 2016

Project:

Design and construction of water pipeline system of the 3rd stage of the Olympic Town in Ashgabat 2016.

Key facts:

Client: Water management entity Ashgabatagyzsuw 

 

Year: 2015 - 2015

Project:

Reconstruction of the olympic city's water lines with a total length of 7km,  Ø530-630mm in Ashgabat:

  1. On Ataturk Street from Kipchak Street to Oguzhan Street

  2. Turkmenbashi street from 10 Yyl Abadanchylyk Street to Yashlyk Street) 

  3. 3Hodja Ahmed Yasavy (from B.Ananov to Bitarap Turkmenistan shyoly)

Key facts:

  • 7000m of pipes

  • Ø530-630mm Diameters used 

Client:

Renesans Heavy Industries Turkmenistan

 

Year: 2020 - 2021

Project:

IConstruction of 432 MW (ISO condition) simple cycle gas turbine power plant

Installation and commissioning  of gas pipeline between AGRS and turbines

Key facts:

  • TIG/MIG Welding Processes

  • Over 3000 WDI of welding works

  • Over 350 welding joint 

  • Over 3000m of pipes installed 

  • ASME 31.1, 31.1

  • 98%  NDT success rate

Client: Economic Society  Taze Jay

 

Year: 2013 -2015

Project:

Construction of a water treatment plant for a supply of 50,000m3 of portable water per day.  Installation of 100km  pipeline  in the village of Mukry Koytendag Etrap Lebap Welayat.

Key facts:

  • 50,000m3 of portable water being supplied 

  • Over 100km of pipelines installed

  • Over 300 people employed 

Client: Water management entity Ashgabatagyzsuw 

 

Year: 2013 - 2014

Project:

Removal of the reservoir and water supply network within the streets of A.Niyazov, Bitarap Turkmenistan and Gorogly in Ashgabat

Key facts:

Client: NATA holding and Water management entity Ashgabatagyzsuw 

 

Year: 2012 -2012

Project:

ICRemoval of water and sewerage networks from the Beatarap Turkmenistan Shayaly construction zone in Ashgabat

 

(Water Supply Network of bitarap Turkmenistan - Oguzkhan streets) 

Key facts:

Client: NATA holding and Water management entity Ashgabatagyzsuw 

 

Year: 2012 - 2012

Project:

Relocation of the water and sewer systems out of the construction zone of the pedestrian crossing at the junction of A. Niyazov-Turkmenbashi

Key facts:

Client: Water management entity Ashgabatagyzsuw 

 

Year: 2012-2012

Project:

Reconstruction of the water supply system on N.Pumma Street and Ch. Narimov Street in Ashgabat

Key facts:

Client: Water management entity Ashgabatagyzsuw 

 

Year: 2011 - 2012

Project:

Reconstruction of the water pipeline from water treatment unit to Choganly in Ashgabat 

Key facts:

Client: NATA holding and Water management entity Ashgabatagyzsuw 

 

Year: 2011 - 2011

Project:

Removal of the water pipeline from the construction zone of the transport interchange in the area of the bridge crossing over the Karakum River north of the city of Gyami

Key facts:

Client: Administaration municipality of Annau city

 

Year: 2011 - 2011

Project:

  • Electification of wells on Horosan St. Serahs 

  • Electification of wells on the street "Sh.Durda" Etrap Serahs 

  • Electification of wells on Mollamurt Street etrapa Serahs 

  • Electification of wells on Magtymguly Street etrapa Serahs.

  • Electification of wells on D/B "O.Salyr" etrap Serahs

  • Electification of wells on D/B "Bereket" etrapa Serahs

  • Electification of wells on D/B "A.Tekaeva" etrap Serahs

  • Electification of wells on Bugdayly Etrap Serahs

Key facts:

Client: Administaration municipality of Lebap welayat

 

Year: 2011- 2011

Project:

Intra-site water network of water treatment unit of Seydi city

Key facts:

  • 12,000 of pipes installed 

  • Over 50 people installed

Client: Administaration municipality of Lebap welayat

 

Year: 2010 - 2011

Project:

Reconstruction of the water pipeline of  Seidi city from water treatment unit to Point A, Road 2 

Key facts: